Airco Temescal Cv-8 Manual

Posted on -

Description Airco Temescal FC-1800 Evaporator Photos: Download OEM: Airco Temescal Model: Temescal FC-1800 Evaporator Description: Airco Temescal FC-1800 Evaporator System with Airco Temescal HV CNTL 14 (SN 175), Serial Number 210, To Include: Power Supply, Control Panel, CTI-Cryopump 8, Part Number 3543811G004, Serial Number Location:San Jose, CA, U.S.A. Please contact us for the availability of the following used semiconductor equipment and parts.

ALUMINUM VACUUM GATE VALVES E. McGrath Inc, 35 Osborne St, Salem MA  01970 VVGA090 Airco ST 2' CVC air split body $375 VVGA100 Airco ST 2' ASA air split body $400 VVGA120 Airco STM 4' manual split body manifold light flange $695 VVGA130 Airco ST 4' ASA air split body, $695 VVGA140 Airco ST 4' ASA manual split body $595 VVGA160 Airco ST 6' ASA air split body $795 VVGA180 Airco ST 6' ASA manual split body $695       CPA 7814 4' ASA air with integral H 2O baffle and 1 inch OD ion & roughing ports.

Open the Roughing Valve by lifting the red toggle protector and metal lever up (Figure 38). Figure 38 – Pneumatic Roughing Valve (Open) ‰ 50. Pump the system down to 2E-2 torr (Figure 39 shown in blue). Figure 39 – Varian SenTorr ‰ 51.

Turn off power at main circuit breaker Figure 30 – Circuit Breaker (Off) ‰ 41. Close the HiVac valve (clockwise), it is important to make sure it is completely closed so apply approximately 50 pounds of force to the lever; you want it to be snug but not too tight.

Next, press the “Time” button and enter a value for “Time” (typically ‘9999’) and press “Enter” † 5. Press the “Density” button and enter a value for “Density” (this depends on the metal you are depositing and should be obtained from the Bulk densities and Z Values table) and press “Enter” † 6. Press the “Z Ratio” button and enter a value for “Z Ratio” (again, this depends on the metal you are depositing, obtain from the Bulk Densities and Z Values table) and press “Enter” † 7. Finally, press the “Tooling” button and enter a value for “Tooling” (typically ‘100’), press “Enter” ‰ 24. Open the water valve (located behind Indy) by turning the valve to your left until the handle is parallel with the water line as shown in Figure 19. Figure 22 – CV-8 AircoTemescal † 1.

Close the Bell Jar by pulling the lever backwards (indicated by the red arrow in Figure 36) Figure 36 – Bell Jar in the Closed Position ‰ 48. Next, close the Vent Valve by turning it clockwise (right), as seen in Figure 37 Figure 37 – Vent Valve (Close) ‰ 49. Open the Roughing Valve by lifting the red toggle protector and metal lever up (Figure 38). Figure 38 – Pneumatic Roughing Valve (Open) ‰ 50. Pump the system down to 2E-2 torr (Figure 39 shown in blue).

Airco Temescal Cv-8 Manual Karl Suss MA150 Mask Aligner with Manual Substrate Handling Temescal FC-1800 Electron Beam Evaporator Power Supply CV-8 Substrate Heaters Electron-Beam E-Gun Power Supply. Airco Temescal Cv-8 Manual Karl Suss MA150 Mask Aligner with Manual Substrate Handling Temescal FC-1800 Electron Beam Evaporator Power Supply CV-8 Substrate Heaters Electron-Beam E-Gun Power Supply.

सविता भाभी एव XXX अपार्टमेंट के अन्य एपिसोड्स PDF में. Savita Bhabhi; Savita. Savita bhabhi pdf hindi online.

Figure 31 – Hi-Vac Valve ‰ 42. Remove the front panel again by pulling downward on the rings and lifting up on the panel (Figure 32). Figure 32 – Front Panel Latches (marked by arrows) ‰ 43. Modular technologies inc. Open the “Vent Valve” by turning the knob counter clockwise (or to your left) until you hear a slight “hissing” sound, then turn it two or three more times as seen in Figure 33. Wait for the chamber to vent, the hissing will stop when it has reached Atmospheric pressure.

Cv-8

Place your wafer on the substrate mounting platter and secure it by fastening the metal clips as shown in Figure 7. Note: You need to use the 5/16th inch socket wrench to fasten the clips.

Airco Temescal Cv-8 Manual

ON” button (highlighted in orange) and hold for 1 second † 4. Press the “Gun #1 Fil. On” button (highlighted in yellow) † 5. Turn the “Emission Control” knob (in green) to desired setting which is dependent on the metal you are depositing ‰ 28. Look through the window in the bell jar, a light purple glow in the crucible in the chamber indicates the metal is heating up as seen in Figure 23. Figure 25 – Shutter Control (Open) ‰ 1. The shutter is controlled by a rubber tube located below the bell jar.

Turn off water valve (located behind Indy) by turning the valve to your right until the handle is perpendicular with the water line (Figure 29) Figure 29 – Water Valve (Off) ‰ 40. Turn off power at main circuit breaker Figure 30 – Circuit Breaker (Off) ‰ 41. Close the HiVac valve (clockwise), it is important to make sure it is completely closed so apply approximately 50 pounds of force to the lever; you want it to be snug but not too tight. Figure 31 – Hi-Vac Valve ‰ 42. Remove the front panel again by pulling downward on the rings and lifting up on the panel (Figure 32). Figure 32 – Front Panel Latches (marked by arrows) ‰ 43.